Built for the people who keep buildings running.

Facility management for every building you run.

Upload the drawings, O&M manuals and closeout binders you already have. In a day, the AI builds your sites, buildings, rooms and equipment, and your team checks every item before it goes live.

  • Set up from your own documents
  • Contractors log their own work
  • Built to WCAG 2.1 AA
BuildingHelm home screen for a facilities manager: a "Needs you" strip with new requests, work orders and punch items to review, overdue emergency or high work orders and overdue code inspections, then Work orders and Maintenance panels with open, past-due and overdue counts and the newest requests.
A technician's phone home screen: a Needs you card, their counts of open work orders, overdue tasks and tasks due this week, their open work orders with priority and status, a bottom bar with a Scan tab, and a round plus button for adding a punch item.

Sample data. Northfield University is a fictional university.

Set up in a day

Start from the building documents you already have.

Nobody has time to type every room and air handler into a new system. BuildingHelm starts with the binders on your shelf: the AI reads them and builds the record, and your team checks it.

What it builds

  • Sites, buildings, floors and rooms
  • Equipment, with make, model, serial and install date where the documents have them
  • Warranties, with their end dates and the vendor to call
  • Maintenance tasks from the O&M manuals, assigned when you're ready

Illustration with sample data. Nothing is added until you accept it.

  1. Step 1

    Upload what you have

    Pick a building, then add its drawings, O&M manuals, closeout binders, warranty letters and equipment lists. PDFs, scans, photos, Word and Excel files, ZIP archives or whole folders, up to 20 files and 1,000 pages at a time.

  2. Step 2

    The AI reads every page

    It sorts each page by what it is, then reads the floors and cleans up the floor plans, and reads the rooms, equipment, warranties and maintenance tasks. Where a manual says nothing, it adds standard maintenance tasks.

  3. Step 3

    Your team checks every item

    Each item shows the page it came from and how sure the AI is. Accept it, edit it or skip it. Nothing is saved until you accept it.

  4. Step 4

    Go live

    Print QR labels, invite your crew and your contractors, and start taking work orders. The documents you keep stay with the buildings and equipment they describe.

Missing a model number? Snap the nameplate with your phone and we'll fill in the make, model and serial.

Prefer spreadsheets? Import buildings, rooms and equipment from CSV or Excel with our template. A preview flags problems before anything is saved.

The day-to-day work

Work orders, maintenance and punch lists, side by side.

Three jobs with different rhythms, so BuildingHelm gives each its own screen, color and icon, on the desktop and on the phone. Capital planning runs on the same records.

Work orders

Problems reported in seconds, fixed without the phone tag.

Requests from tenants, teachers, students and staff, and work your crew creates itself, land in one queue with a priority, an owner, a due date and a full history.

  • A QR label on every room and piece of equipment opens the report form with the location already filled in.
  • Whoever reports it needs no account, and gets a private tracking link by email.
  • Review new requests, then approve and assign to a technician or contractor in one step. Home shows what is waiting for you.
  • Every job moves from Open to In progress, Pending review and Done: a manager approves the work before it counts.
  • Technicians start a job, then tap Mark done with hours, notes and an after photo, right from their phones.
A technician in safety glasses scans the QR label on an air handler with his phone.
Work orders on the Open tab, with tabs for New requests, Open, Pending review, Done and Rejected or merged: each work order shows its status (Open, In progress or On hold), priority, who it is assigned to and its due date.
A work order on a phone: the step bar, a Next step card with large Mark done and Put on hold buttons, and the details below.
Maintenance

Preventive maintenance and inspections that don't slip.

Every recurring task on every piece of equipment, with the inspections the code requires marked as such, and a clear list of what's overdue.

  • Recurring schedules by days, weeks, months or years, with optional checklists, assigned to a technician or a contractor.
  • Code-required inspections tracked with results and certificates: fire, boiler, elevator, generator and the rest.
  • One daily digest by email and in the app, instead of a message for every task.
  • Scan the QR label on a piece of equipment and the task that's due opens, ready to mark done.
  • An on-time completion rate, and compliance reports in PDF or Excel for fire marshals, surveyors, insurers and state inspectors.
Gloved hands hold a phone next to a wall-mounted fire extinguisher tagged Inspected.
Maintenance schedules: recurring filter changes, belt checks and a generator service, each with equipment, due date, overdue status, assignee and a Mark done button, under tabs for Overdue, Due soon, Schedules, Inspections and History.
Maintenance report showing a 71 percent on-time completion rate, tasks on schedule, overdue count, completed entries, and on-time completion by building with a target marker.
Punch lists

Walk a building. Capture everything. Close it out.

For turnovers, move-ins, renovations, tenant fit-outs and handovers: your crew walks the building and lists what needs fixing, room by room.

  • Add an item in under a minute on a phone: a photo first, then the room (or "Not in a room"), what it is and how urgent. It works without a signal and sends when you're back online.
  • Assign items to a technician or contractor, and escalate one to a work order in a click.
  • A manager approves the fix before the item counts as done.
  • Export the list to PDF with photos, or to Excel, to send to a contractor.
A staff member with a tablet walks down a corridor lined with room doors.
A summer turnover punch list for a residence hall: 3 of 12 items finished, with PDF and Excel export buttons and items such as a loose dryer vent and a dripping faucet, each with status, priority, assignee and due date.
Adding a punch item on a phone: Take a photo of the problem first, then choose the building, floor and room.

Capital planning and FCI

See the replacements coming before they hit the budget.

The records your crew keeps every day become a capital plan that finance, owners and boards can read. Plan, Backlog and FCI are tabs of one page, next to your work orders. How FCI works

Rooftop condensing units on a white membrane roof, with brick buildings behind.
Replacement cost for a rooftop unit: an effective cost of 78,000 dollars labelled AI estimate, a low to high range, and a line-item breakdown for equipment, labor, removal, materials and permits.
Capital planning on the Plan tab, next to Backlog and FCI: total replacement cost to 2035, overdue replacements, a bar chart of replacement cost by year, and costs by building.
Capital planning on the FCI tab: a campus Facility Condition Index of 0.031 rated Good, the backlog and replacement value, and FCI by building rated Good, Fair or Poor.

Replacement estimates

A budget-level estimate for any piece of equipment, with a low, likely and high figure and a line-item breakdown, adjusted for your location.

Capital plan by year

Equipment by estimated replacement year, up to 100 years ahead, by building and category, exported to PDF or Excel for the budget meeting.

Backlog and FCI

A backlog of deferred maintenance and the Facility Condition Index for each building and the whole site, rated Good, Fair or Poor, with its history over time.

Estimates are clearly labelled. Every AI estimate says so, with the date it was made, and is kept for price history. When you add a contractor quote, the quote takes priority in the capital plan.

For the crew

Built for the people who do the work.

Technicians, contractors and the facilities team each get the screens for their part of the job, and the same record underneath.

  • Technicians

    Their jobs on a phone. Scan a label, do the work, mark it done with hours and an after photo. Large buttons, a dark mode for dim mechanical rooms, and entries saved when the signal drops.

    Working from the phone
  • Contractors

    One login for every owner they work for. They see only the work you assign them, and log it themselves, so you get the record.

    The contractor portal
  • The facilities team

    One queue for every request, a daily digest of what's due, reports on how the work is going, and the capital plan ready when leadership asks.

    Reports

On the phone, even offline

Scan it, do the job, mark it done.

Technicians and contractors work from their phones, in mechanical rooms and on roofs, with large buttons, a dark mode and no hunting for the right screen.

  • The Scan tab reads the QR label on a piece of equipment or a room door, or you can type the asset tag. The task that's due opens, ready to mark done.
  • Mark done in one sheet: hours with quick chips, what was done, parts and an after photo. Then it goes to a manager for approval.
  • Works without a signal. Entries are saved on the phone and sent when it's back online, and a Waiting to send count shows what's still to go.
  • A round plus button adds a punch item from any page, photo first.

Reviewing and approving work needs a connection.

The Scan tab on a phone: scan the QR label on a piece of equipment or a room door, scan a photo of the label, or type the asset tag or room number instead.
A work order on a phone: the step bar, a Next step card with large Mark done and Put on hold buttons, and the details below.
A contractor's phone home screen listing the two organizations they work for, Lakeside College and Northfield University, each with open, due-soon and overdue counts, and a Scan tab in the bottom bar.

Contractor portal

One login for every owner they work for.

Your elevator, HVAC and fire alarm vendors record their work in BuildingHelm themselves, from their phones. They see only what you assign them, and you get the record.

  • A company joins once and keeps the same login for every owner it works for.
  • Inside your organization they see only their assigned work orders, maintenance and punch items. Never your costs, warranties or other vendors.
  • Owners never see each other, or which other owners a contractor works for.
  • They scan a label, log hours, notes and photos, and mark a job done on the spot, even without a signal. Their insurance certificate stays current for every owner at once.
More about the contractor portal

Reports

Know how the work is going.

Reports for work orders, maintenance, punch lists, manpower and, for roles that may see costs, spending.

  • Manpower: how many people worked on site each day and for how long, your own crew and your contractors, with the busiest day and the average headcount.
  • Maintenance: the on-time completion rate for every building and the whole site, against a target.
  • Compliance: code-required inspections, results and certificates in PDF or Excel, for the fire marshal, the surveyor or your insurer.
The Manpower report: how many people worked on site each day and for how long, with total hours, person-days, average daily headcount and peak day, and a bar chart of headcount per day.

Buildings and floor plans

See every building at a glance, then open its floor plan.

Each building gets a card with its photo, open work orders, maintenance tasks due and open punch list items, with what's overdue in red, so you know where to go first.

  • Every building on one page, the ones that need someone today first.
  • Red for emergency or high work orders and overdue code inspections, amber for work coming up, green for all clear.
  • Open a building's floor plans to see its equipment and open work orders where they are.

The Buildings page with sample data.

QR labels, warranties and more

The details your crew uses every day.

Warranties tracked to the day, the right reminders to the right people, and the records you need when someone asks.

Warranties list with a notice that 4 warranties end within 90 days, and coverage for chillers, generators, roofs and elevators marked Expiring soon or Active with end dates.
  • QR labels

    Print labels for rooms and equipment on standard Avery sheets, straight from BuildingHelm. Your crew scans them from the Scan tab; everyone else scans them to report a problem.

  • “May be under warranty”

    Before anyone pays for a repair, a banner warns when the equipment or space may still be covered.

  • Warranty reminders

    Reminders 90, 60 and 30 days before a warranty ends, so you use the coverage you paid for.

  • A daily digest

    One email and one in-app note a day: what's overdue, due today and coming up, not a message for every task. Everyone chooses what they get.

  • Search everything

    Find any building, room, piece of equipment, work order, request, punch item or warranty from one search box.

  • Compliance reports

    Inspection history with results and certificates, ready for an auditor, in PDF or Excel.

  • Audit log

    Who created, changed or archived what, and when, with the values before and after.

  • Data export

    Export all of your organization's data and files at any time.

  • Roles that match your team

    Owner Admin, Facilities Manager, Technician and a read-only Viewer for finance and leadership.

  • Help Center

    Short how-to guides for every role, with the steps for each job.

Coming soon In development

Walk through your buildings in 3D.

Open a building and step inside: every boiler, panel and air handler pinned where it actually is. Click a pin for its condition, next tasks and work orders.

  • Bring a 3D scan of your building, or 360° photos from an affordable camera.
  • Pin equipment right where it sits, room by room.
  • Click a pin to see tasks and history, or create a work order on the spot.

Preview of a feature in development. Screens may change before release.

How it will work

  1. 1Capture

    Scan each floor with a 3D scan, or take 360° photos with an affordable camera.

  2. 2Pin

    Drop each boiler, panel and air handler right where it sits, room by room.

  3. 3Act

    Click a pin for its condition, next tasks and history, or create a work order on the spot.

Security and accessibility

Ready for your IT, purchasing and accessibility review.

The measures below are in place today, and the security page explains each one.

Read the security overview

No SOC 2 report yet. We're a young company and won't claim certifications we don't have. We're happy to fill in your security questionnaire.

  • Each organization kept apart

    Row-level security on every table decides who can read or change each record, not just the screens. Automated tests check it on every change.

  • Private files, expiring links

    Photos and documents live in private storage and are shown only through signed links that expire.

  • Audit log

    Every create, change and archive is recorded with who, when, and the values before and after. Nothing is hard-deleted.

  • Daily backups

    The database is backed up every day and encrypted at rest; all traffic is encrypted in transit.

  • WCAG 2.1 AA

    Built to WCAG 2.1 AA and checked with automated accessibility tests. A VPAT is available on request.

  • Your data, exportable

    An Owner Admin can export all of your data and files at any time. You own it.

FAQ

Questions facilities teams ask us.

What kinds of buildings does it work for?
Any building with equipment to look after and a crew to keep it running: colleges and universities, offices and commercial buildings, K-12 schools, hospitals, clinics and senior living, and apartment and condo buildings. One organization can mix them.
What documents can we upload for setup?
Whatever you have for a building: drawings, O&M manuals, closeout binders, warranty letters and equipment lists, as PDFs, scans, photos, Word and Excel files, ZIP archives or whole folders. You import one building at a time, up to 20 files and 1,000 pages at once, after answering a few questions about the files. You can import more than once.
What if the AI gets something wrong?
Every item shows the page it came from and how sure the AI is, and nothing is saved until someone on your team accepts it. Edit anything before you accept it, or skip it. You can go live with the buildings you've checked and finish the rest later.
Can we import spreadsheets instead?
Yes. Upload buildings, floors, rooms and equipment as CSV or Excel files, starting from our template. A preview shows any problems row by row before anything is saved.
Is there a phone app?
BuildingHelm works in the browser on any phone or tablet, and you can add it to the home screen like an app. Screens are built for the field, with large buttons and a dark mode, and entries made without a signal are saved on the phone and sent when it's back online. Native App Store and Google Play apps are on our roadmap.
Do you support single sign-on (SSO)?
Not yet. Today people sign in with an email and password or a one-time email link. Single sign-on is on our roadmap; tell us which identity provider you use when you book a demo.
Who owns our data?
You do. An Owner Admin can export all of your organization's data and files at any time. Records are archived rather than deleted, and your data is never shared with another organization.
Is BuildingHelm accessible?
BuildingHelm is built to WCAG 2.1 AA, the standard public schools, colleges and agencies are held to under the ADA Title II web accessibility rule: keyboard access, screen reader labels and enough contrast, in light and dark mode. A VPAT (accessibility conformance report) is available on request. See our security and accessibility overview.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.