Work orders

Work order software for campuses and every building you run

Turn every request from a student, tenant, teacher or nurse into a tracked work order, with the location already filled in, an owner, a due date and a full history.

Work orders on the Open tab, with tabs for New requests, Open, Pending review, Done and Rejected or merged: each work order shows its status (Open, In progress or On hold), priority, who it is assigned to and its due date.

Sample data. Northfield University is a fictional university.

The problem

Requests that arrive by email, phone and hallway conversation

On most campuses, and in most buildings, a leaking ceiling gets reported five ways: an email to the office, a call to the front desk, a note to the building coordinator, a text to a favorite technician and a word in the hallway. Some of those become work. Some become the same job twice. A few never become anything.

The person reporting rarely knows the room number format or which category fits. Facilities spends time calling back to ask where the problem is, while the person who reported it wonders whether anyone got the message.

Without one queue, nobody can say how many requests are open, how long they take or which buildings generate the most calls. The crew starts the day with a list that's already out of date.

How BuildingHelm handles it

A request form anyone can use, and a queue your team controls

BuildingHelm keeps the front door simple for the people reporting, and keeps assigning and closing work in the hands of your team.

A work order on a phone: the step bar, a Next step card with large Mark done and Put on hold buttons, and the details below.
  • QR labels that fill in the location

    Print labels for rooms and equipment. A scan opens the report form with the building, floor, room and equipment already chosen.

  • No account for the person reporting

    Students, tenants, teachers and staff describe the problem, pick a category such as Plumbing, Electrical, Lighting or Cleaning, add photos and mark it urgent. A spam check and a limit on submissions keep junk out.

  • A tracking link by email

    Whoever reported it gets a private link to follow the request, and an email when its status changes.

  • Review before it becomes work

    A facilities manager approves a request to create a work order, merges it into a duplicate, or rejects it with a reason. Home shows what's waiting for you.

  • Priority, due date and assignee

    Each work order has a priority of Emergency, High, Medium or Low, a due date and one or more assignees: your technicians or a contractor company.

  • Clear statuses

    Open, In progress, Pending review and Done, with On hold for a job that's waiting on parts, access or a contractor. Tabs separate them, with counts.

  • Linked equipment and warranty warnings

    Link a work order to a piece of equipment so it shows in that asset's history. If the equipment may still be under warranty, a banner says so before money is spent.

  • Reports

    Open work orders by building and priority, the average time to complete, and a manpower report of who worked how many hours. Roles allowed to see costs also get cost by building.

How it works

From setup to a working routine

  1. Step 1: Someone reports a problem

    A scan of the QR label, or your report link, opens a short form: where, what, and how to reach them.

  2. Step 2: Facilities reviews new requests

    The New requests tab shows each one with its location, photos and who reported it. Approve it, merge it or reject it.

  3. Step 3: Assign and set a priority

    Choose a priority and due date and assign a technician or contractor. They're notified at once.

  4. Step 4: The technician works from a phone

    They start the job, then tap Mark done: hours, what was done, parts and an after photo. Without a signal it's saved on the phone and sent later.

  5. Step 5: A manager approves it

    Approving moves it to Done and keeps the full history on the building, room and equipment. The person who reported it can see the outcome.

Work orders sit next to preventive maintenance and punch lists, so a failed inspection or a walk-through item becomes a work order in a click. Book a demo to see the queue with sample data.

A technician in safety glasses scans the QR label on an air handler with his phone.

Illustrative photo.

Who uses it

Built for the crew, and the people they report to

  • The facilities team

    Facilities managers review, approve and assign work, and see open work by building and priority without building a report by hand.

  • Technicians

    Technicians see their assigned jobs on a phone, with the location, the request and the photos, and mark them done on the spot.

  • Contractors

    Vendors get the work orders assigned to their company, log their own hours and photos, and never see other vendors or your costs.

  • Finance and leadership

    Viewers get read-only reports, including cost by building, without being able to change anything.

FAQ

Frequently asked questions

What is work order software?
It collects repair requests, turns the approved ones into work orders with a priority, due date and assignee, and tracks each job through to done. The history stays with the building, room and equipment.
Do people need an account to report a problem?
No. Anyone can report a problem from your link or a QR code without signing in, and they get an email with a private tracking link. Only your crew and contractors sign in.
Can people add photos?
Yes. The form takes photos, and technicians add "after" photos from their phones when the work is done. Photos are stored privately and shown through links that expire.
How do duplicate reports get handled?
When several people report the same problem, a facilities manager merges the new request into the existing one instead of opening a second job.
Can we assign work to an outside contractor?
Yes. A work order can go to a contractor company. Its people see only the work assigned to them, log their own hours and photos. See the contractor portal.
What about emergencies?
The report form tells people to call 911 or their safety office for a fire, a gas smell or an injury instead of filing a report. The urgent box and the Emergency priority are for repairs that need fast attention, not for emergency response.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.