Healthcare and senior living

Facility management for healthcare and senior living

In a hospital, clinic or senior living community, the building is part of the care. BuildingHelm keeps your life-safety and generator testing logs, gets urgent work done first, and has the records ready when the surveyor asks.

BuildingHelm home screen for a facilities manager: a "Needs you" strip with new requests, work orders and punch items to review, overdue emergency or high work orders and overdue code inspections, then Work orders and Maintenance panels with open, past-due and overdue counts and the newest requests.

Sample data. Northfield University is a fictional university.

The problem

When the surveyor arrives, the records have to be there

Healthcare facilities teams test and inspect constantly: emergency generators, transfer switches, fire alarms, sprinklers, fire doors, medical gas, emergency lighting. Each test needs a dated record with who did it and what they found.

Those records often live in binders, in vendors' emails and in a spreadsheet on one person's computer. When the surveyor or the fire marshal asks for a year of generator tests, someone spends a day pulling them together and hoping nothing is missing.

Meanwhile the work never stops. A call light, a leaking ceiling over a resident's bed or a failed nurse call can't wait in the same queue as a squeaky door.

How BuildingHelm handles it

Tests, inspections and repairs, with the record kept every time

BuildingHelm treats every required test as scheduled work on a piece of equipment, with a result and a record each time, and puts urgent repairs at the top of everyone's list.

A technician's phone home screen: a Needs you card, their counts of open work orders, overdue tasks and tasks due this week, their open work orders with priority and status, a bottom bar with a Scan tab, and a round plus button for adding a punch item.
  • Generator and life-safety testing logs

    Schedule weekly, monthly and annual tests on each generator, transfer switch, fire pump and alarm panel. Each test is logged with its date, who did it, the result, notes and photos. See compliance tracking.

  • Records ready for the surveyor

    A compliance report for a building or a category, with every required schedule, its last test, result and certificate, in PDF or Excel. Statuses come from the dates, not from someone's typing.

  • Failed tests reach managers at once

    Log a test as Fail and facilities managers are notified straight away. Turn it into a work order in a click.

  • Urgent work first

    Every work order has a priority. Overdue emergency and high-priority work shows in the Needs you strip at the top of every manager's Home. See work orders.

  • Requests from nursing and staff

    Staff report problems from a QR label on the unit or a shared link, without an account, and get a tracking link by email.

  • Contractors with a record

    Generator, elevator and fire alarm vendors log their own tests and results from their phones, and keep their insurance certificate on file. See the contractor portal.

  • Preventive maintenance on every asset

    Air handlers, chillers, boilers and sterilizer support equipment on recurring schedules, with the next due date moving forward on its own. See preventive maintenance.

  • An audit trail

    Every change is recorded with who made it, when, and the values before and after. Nothing is hard-deleted.

Set up in a day

Set up from your life-safety drawings and equipment manuals

Import the documents your facility already keeps, one building at a time. The AI reads every page and proposes the building's floors, rooms and equipment, with warranties and maintenance tasks from the manuals. Your team checks every item, with the source page beside it, before it goes live.

What you can upload

  • Life-safety and floor plan drawings
  • Generator, fire pump and air handler manuals
  • Closeout binders and warranty letters
  • Past inspection and test reports
How setup works

How it works

From setup to a working routine

  1. Step 1: Upload your documents

    Drawings, equipment manuals and closeout binders as PDFs, scans, photos, ZIP archives or whole folders, one building at a time, or an equipment spreadsheet.

  2. Step 2: Review what the AI found

    Accept, edit or skip each building, room and piece of equipment, with the page it came from beside it.

  3. Step 3: Schedule the required tests

    Add generator, fire alarm, sprinkler and other tests to each piece of equipment, and mark the ones that are required.

  4. Step 4: Assign your crew and your vendors

    Give each test and each schedule to a technician or a contractor company. They log results from their phones.

  5. Step 5: Keep the record ready

    Watch the overdue list and the daily digest, and run the compliance report whenever a surveyor or inspector asks.

Renovations close out with punch lists, and aging equipment feeds the capital plan. It works for a single clinic, a hospital with many buildings or a group of senior living communities. Book a demo and we'll show you a testing log built from sample data.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.

Illustrative photo.

Who uses it

Built for the crew, and the people they report to

  • The facilities team

    Directors of facilities and plant operations set the testing schedules, watch what's overdue and hand the compliance report to the surveyor.

  • Technicians

    Technicians log each test on a phone with the result and photos, and mark urgent repairs done the moment they're finished.

  • Contractors

    Vendors who test generators, alarms and elevators log their own results and certificates, see only their assigned work.

  • Finance and leadership

    Administrators and executive directors get a read-only view of the compliance register, capital plan and cost reports.

FAQ

Frequently asked questions

Does BuildingHelm make us compliant with Joint Commission or CMS rules?
No software can do that on its own. BuildingHelm keeps the schedule and the record for the tests and inspections you mark as required, and produces the report. It doesn't decide which standards apply to your facility or certify that you meet them.
Can we log weekly and monthly generator tests?
Yes. Add each test as a recurring schedule on the generator or transfer switch, by days, weeks, months or years. Each time it's done, log the result, notes and photos.
Is it built for patient information?
No. It's for building and equipment records. Keep patient details out of requests, notes and photos, and describe the room and the problem instead.
Does it work for senior living communities?
Yes. Each community is a site with its own buildings, rooms and equipment. Residents' rooms, common areas and kitchens all take work orders and maintenance schedules.
Do you have a SOC 2 report?
No. BuildingHelm does not have a SOC 2 report and does not claim one. Access is enforced by role in the database, files are private, and every change is in the audit log. See the security overview.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.