Commercial buildings

Maintenance software for commercial buildings

Tenant requests, HVAC, elevator and life-safety maintenance, and the contractors who do half the work, in one system for every building you run. BuildingHelm sets it up from your drawings, O&M manuals and closeout binders in a day.

Work orders on the Open tab, with tabs for New requests, Open, Pending review, Done and Rejected or merged: each work order shows its status (Open, In progress or On hold), priority, who it is assigned to and its due date.

Sample data. Northfield University is a fictional university.

The problem

Tenants call, vendors email, and the binders live in the basement

In an office building or a portfolio of them, requests come from everywhere: a tenant's email, a call to the management office, a note at the front desk. Some become work, some get done twice, and some get lost until the tenant calls again.

Much of the work is done by contractors. The elevator company, the HVAC service contract, the fire alarm vendor, the roofer. They show up, do the work and send a PDF days later, if at all. When the insurer or the fire marshal asks for the inspection history, you go looking through email.

And when a building changes hands or gets a new chief engineer, the knowledge about every rooftop unit and backflow preventer walks out the door. The closeout binders are still in the basement. Nobody has time to type them into a system.

How BuildingHelm handles it

Every request, schedule and vendor visit, on the right building

BuildingHelm keeps one record for each site, building, floor and suite, and runs the day-to-day work against it: tenant requests, preventive maintenance, contractor visits and the capital plan.

A work order on a phone: the step bar, a Next step card with large Mark done and Put on hold buttons, and the details below.
  • Tenant requests without a login

    Tenants report a problem from a QR label in the suite or a link you share. They add photos, get a tracking link by email and hear back when it's done. See work orders.

  • HVAC, elevator and life-safety PM

    Recurring schedules for rooftop units, chillers, elevators, generators, fire pumps and backflow preventers, assigned to your engineers or a vendor. See preventive maintenance.

  • Contractors in your system

    Vendors log their visits, hours, photos and results from their phones, see only the work you assign them, and keep their insurance certificate on file. See the contractor portal.

  • Inspection records on demand

    Code-required inspections with results and certificates, in a PDF or Excel report for the fire marshal, the insurer or a buyer's due diligence. See compliance tracking.

  • Punch lists for fit-outs and turnovers

    Walk a suite before a tenant moves in or after a renovation, capture each item with a photo and send the list to the contractor. See punch lists.

  • Capital planning by building

    Replacement years and cost estimates for major equipment, a deferred maintenance backlog and an FCI for each building. See capital planning.

  • Warranties that pay

    A warning that equipment may be under warranty appears before anyone pays for the repair, and reminders go out before coverage ends.

  • Manpower and cost reports

    How many people worked in each building and for how long, your own engineers and your contractors, and cost by building for the roles allowed to see it.

Set up in a day

Set up from the closeout binders you already have

Every commercial building comes with a stack of turnover documents. Import them one building at a time, as PDFs, scans, photos, ZIP archives or whole folders. The AI reads every page and proposes each building's floors, rooms and equipment, with warranties and maintenance tasks from the manuals. Your team checks each item, with the source page beside it.

What you can upload

  • Architectural and MEP drawings
  • O&M manuals and equipment submittals
  • Closeout binders and warranty letters
  • Service contracts and old equipment lists
How setup works

How it works

From setup to a working routine

  1. Step 1: Upload your building documents

    Drawings, O&M manuals and closeout binders, as PDFs, scans, photos, Word and Excel files, ZIP archives or whole folders, one building at a time. Spreadsheets work too.

  2. Step 2: Review what the AI found

    Accept, edit or skip each building, suite and piece of equipment, with the page it came from open beside it.

  3. Step 3: Put QR labels on equipment and suites

    Print labels on standard label sheets. Your engineers scan one to open the asset; tenants scan one to report a problem.

  4. Step 4: Invite your engineers and your vendors

    Engineers get the Technician role. Contractor companies are invited by email and see only what you assign them.

  5. Step 5: Run every building from one queue

    Requests, preventive maintenance and vendor visits come together, and the daily digest says what's due.

One system works for a single office building or a mixed portfolio of offices, schools and medical buildings. Book a demo and we'll show you a building set up from sample documents.

A technician in safety glasses scans the QR label on an air handler with his phone.

Illustrative photo.

Who uses it

Built for the crew, and the people they report to

  • The facilities team

    Property and facilities managers review requests, assign work to engineers or vendors, and watch what's overdue in every building.

  • Technicians

    Building engineers see their jobs on a phone, scan a QR label to open the equipment, and mark work done with hours, notes and an after photo.

  • Contractors

    Vendors log their own visits and results, keep their insurance certificate current. They never see your costs or other vendors.

  • Finance and leadership

    Owners and asset managers get a read-only view of the capital plan, FCI and cost by building, exported to PDF or Excel.

FAQ

Frequently asked questions

Is BuildingHelm a tenant portal?
Tenants can report problems and follow them through a tracking link, without an account. There's no tenant login, lease management or rent collection. It's built for the people who maintain the building.
Can we bill work back to tenants?
Not today. Work orders record hours, parts and cost, and you can export cost reports by building to PDF or Excel, but there's no tenant chargeback or invoicing.
Does it work for a portfolio of buildings?
Yes. Group buildings into sites, see open work and overdue maintenance for each one, and switch between them from the same screens.
Does it connect to our accounting or building automation system?
Not today. There are no direct integrations. Every report exports to PDF or Excel, and an Owner Admin can export all of your data at any time.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.