Compliance inspection tracking for every building

Track every code-required inspection, who did it, the result and the certificate, then hand the report to the fire marshal, the surveyor or your insurer without building a binder by hand.

Maintenance schedules: recurring filter changes, belt checks and a generator service, each with equipment, due date, overdue status, assignee and a Mark done button, under tabs for Overdue, Due soon, Schedules, Inspections and History.

Sample data. Northfield University is a fictional university.

The problem

Inspection records scattered across binders and calendars

Fire extinguishers, fire alarms, sprinklers, backflow preventers, elevators, emergency generators and emergency lighting each have their own inspection schedule and their own authority. In most organizations the due dates live in someone's calendar, the certificates in a binder and the results in a vendor's email.

When a fire marshal, surveyor or insurer asks for the records on a building, pulling them together takes days: find the last inspection, find who did it, find the certificate, and hope nothing expired in the meantime.

Two clocks are easy to confuse. The inspection has a due date, and the certificate it produced has its own expiration. And a failed inspection needs to reach the right person right away, not at the next meeting.

How BuildingHelm handles it

Inspections as scheduled work, with the evidence attached

Compliance in BuildingHelm isn't a separate system. Code-required inspections are maintenance schedules with a few extra fields, so they use the same reminders, assignments and history as everything else.

Overdue maintenance on a phone: filter replacements with equipment, due date, days overdue and a Mark done button.
  • Flag code-required schedules

    Mark any schedule as required by code and record the authority and the certificate expiration. You decide which inspections apply to your buildings.

  • A result on every inspection

    Each inspection is logged with its date, who did it (a technician or a contractor company) and a result of Pass, Fail or Needs follow-up, with notes and photos.

  • Certificates attached

    Attach certificate files to the inspection log or the equipment record. Files are private and shown only through links that expire.

  • Failed inspections reach managers at once

    When an inspection is logged as Fail, facilities managers are notified straight away. From there it can become a work order.

  • Overdue and due-soon reminders

    A daily digest by email and in the app covers inspections coming due and overdue, using the same preventive maintenance schedules.

  • A compliance report in one click

    Choose a building or a category and get every code-required schedule with its authority, frequency, last inspection date, result, who did it, next due date, certificate expiration and certificates.

  • Statuses from the dates

    Each item is Overdue, Due soon (within 30 days) or Current, and certificates are flagged when expired or expiring within 60 days. Nothing is typed in by hand.

  • PDF and Excel

    The PDF has a cover page with the organization, scope, date, summary and signature lines, then the register by building. The Excel file has Summary, Inspections and Certificates sheets.

  • An audit trail

    Every create, change and archive is recorded with who, when and the values before and after. Nothing is hard-deleted.

How it works

From setup to a working routine

  1. Step 1: Tag the inspections that matter

    Open each piece of equipment and mark its inspection schedules as required by code, with the authority and certificate expiration.

  2. Step 2: Assign them

    Give each one to a technician or to a contractor company with the right license.

  3. Step 3: Scan, then log the result

    Scan the equipment's label and its due inspection opens. Choose Pass, Fail or Needs follow-up and attach the certificate.

  4. Step 4: Watch the register

    Use the Overdue and Due soon lists and the daily digest to stay ahead of the calendar.

  5. Step 5: Run the report when asked

    Export the PDF or Excel report for the building or category an inspector asks about.

The register sits on the same records that drive facility condition and capital planning. Book a demo to see a compliance report built from sample data.

Gloved hands hold a phone next to a wall-mounted fire extinguisher tagged Inspected.

Illustrative photo.

Who uses it

Built for the crew, and the people they report to

  • The facilities team

    Facilities managers and safety staff tag requirements, watch the register and hand the report to inspectors, surveyors and insurers.

  • Technicians

    Technicians complete in-house inspections on a phone, record the result and attach photos or certificates.

  • Contractors

    Licensed vendors log inspection results and certificates for the equipment they service, and see only their assigned tasks.

  • Finance and leadership

    Viewers and risk staff can read the register and reports without being able to change a record.

FAQ

Frequently asked questions

What is compliance inspection tracking?
It's keeping a dependable record of the inspections that codes and insurers require, including when each is due, who did it, the result and the certificate, so you can show your compliance when asked.
Does BuildingHelm tell us which inspections the code requires?
No. Requirements vary by place and building. BuildingHelm records and reports what you mark as code-required; it doesn't decide which codes apply or certify that you comply.
What's in the compliance report?
For each code-required schedule: the authority, frequency, last inspection date, result, who did it, next due date and certificate expiration. The PDF lists certificate file names, and the files themselves stay in the system.
How are failed inspections handled?
Logging an inspection as Fail notifies facilities managers straight away, so follow-up work can be assigned at once.
Is BuildingHelm SOC 2 certified?
No. BuildingHelm does not have a SOC 2 report and does not claim one. Access is enforced by role in the database, files are private, and every change is in the audit log. See the security overview.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.