Capital planning

Facility condition index and capital planning

Turn equipment age, condition and cost into the numbers a capital request needs: a deferred maintenance backlog, the Facility Condition Index for every building and a replacement plan for anywhere from 5 to 100 years ahead.

Capital planning on the FCI tab: a campus Facility Condition Index of 0.031 rated Good, the backlog and replacement value, and FCI by building rated Good, Fair or Poor.

Sample data. Northfield University is a fictional university.

The problem

Capital requests that arrive without evidence

Capital money is competitive. A request for a boiler or a roof lands in front of finance, an owner or a board, and the first questions are always the same: how bad is it, how big is the whole backlog, and what's coming next year. Without records, the answer is a walk-through, a consultant or a spreadsheet put together the week before the meeting.

The surprises are the expensive part. A chiller fails and its replacement wasn't in anyone's plan, because nobody had the install date, the useful life and a cost estimate in the same place.

The Facility Condition Index, or FCI, gives the conversation a common measure. The convention comes from APPA, and it works for any building with a replacement value: FCI equals deferred maintenance cost divided by current replacement value. Under 0.05 is rated Good, 0.05 to 0.10 is Fair, and over 0.10 is Poor. For example, a building worth $10 million with $400,000 of deferred maintenance has an FCI of 0.04, which is Good.

How BuildingHelm handles it

From daily records to a capital plan you can defend

The equipment records your crew keeps every day feed the plan. BuildingHelm adds the cost side: replacement estimates, quotes, a backlog and building replacement values.

Replacement cost for a rooftop unit: an effective cost of 78,000 dollars labelled AI estimate, a low to high range, and a line-item breakdown for equipment, labor, removal, materials and permits.
  • A backlog of deferred maintenance

    On the Backlog tab, list unfunded work by building, with an optional equipment or room, description, estimated cost, priority (Life Safety, Code Compliance, Mission Critical or Deferrable), year identified and status (Open, Funded or Completed).

  • Suggestions from your records

    Equipment past its useful life, or rated condition 1 or 2, is suggested for the backlog. Accept items one at a time or in bulk, or add them from a work order or punch item.

  • FCI by building and site

    On the FCI tab, FCI counts open and funded items, and completed items drop out. Buildings without a replacement value are listed and left out of the site figure. Daily snapshots show the trend over time.

  • Replacement values you control

    Enter each building's current replacement value, or let the app estimate it from square footage and building type. Estimated values are always labelled as estimated.

  • AI replacement estimates, clearly labelled

    From any equipment page, get a budget-level estimate with low, likely and high totals, line items for equipment, labor, removal, materials, permits, design and contingency, its assumptions and a confidence level, adjusted for your location. Each is marked as an AI estimate with its date and is kept, never overwritten.

  • Contractor quotes take priority

    Enter an actual quote next to the estimate. When a quote exists, it replaces the AI estimate in the capital plan and the backlog.

  • Capital plan by year

    The Plan tab shows equipment by estimated replacement year, which is the install date plus the expected useful life, together with backlog items in their planned year, totalled by year, building and priority, from 5 up to 100 years ahead.

  • Export for the meeting

    Export the capital plan and FCI report to PDF or Excel for budget meetings and board presentations.

How it works

From setup to a working routine

  1. Step 1: Enter replacement values

    Add a current replacement value to each building, or accept an estimate from square footage and building type and refine it later.

  2. Step 2: Record age, life and condition

    Each piece of equipment carries an install date, expected useful life and a condition rating from 1 to 5. Importing a building's documents fills in install dates where the closeout binders have them.

  3. Step 3: Estimate or quote replacement costs

    Get an AI estimate for budgeting, and add contractor quotes as you collect them.

  4. Step 4: Build the backlog

    Review the suggestions, add items from work orders and punch lists, and set a priority and planned year.

  5. Step 5: Read the FCI and the plan

    See each building rated Good, Fair or Poor, then the year-by-year plan, and export it.

Condition data gets better as preventive maintenance and punch list records feed the backlog. Book a demo to see an FCI report with sample data.

Rooftop condensing units on a white membrane roof, with brick buildings behind.

Illustrative photo.

Who uses it

Built for the crew, and the people they report to

  • The facilities team

    Directors and facilities managers keep values up to date, review suggestions, get estimates and own the backlog and plan.

  • Technicians

    Technicians don't see costs. Their condition ratings, work orders and punch items give managers the facts that feed the backlog.

  • Contractors

    Contractors see none of this. Your team enters their quotes, and estimates, the backlog and FCI are never visible to vendors.

  • Finance and leadership

    Finance, owners and boards use the read-only Viewer role to read the capital plan and FCI, and take the PDF or Excel exports into budget meetings.

FAQ

Frequently asked questions

What is the Facility Condition Index?
FCI is deferred maintenance cost divided by current replacement value, for a building or a whole site. A lower number means a healthier building. The convention comes from APPA.
What counts as a good FCI?
Under 0.05 is rated Good, 0.05 to 0.10 is Fair, and over 0.10 is Poor. BuildingHelm applies these lines to every building and to the whole site, and always shows the rating as a word as well as a color.
How accurate are the AI estimates?
They're budget-level estimates, not bids. Each is labelled as an AI estimate with its date, shows a range and a confidence level, and lists its assumptions. When you add a contractor quote, the quote takes priority.
Does this replace a facility condition assessment?
No. BuildingHelm doesn't inspect your buildings. It calculates FCI from the replacement values, equipment conditions and costs your team records, and it doesn't replace a professional assessment.
Do we need a replacement value for every building?
For the site FCI, buildings without a value are listed and left out, so the figure covers only buildings that have one. Enter values yourself or use an estimate from square footage and building type, which is always labelled as estimated.
Who can see costs and estimates?
Owner Admins, Facilities Managers and read-only Viewers. Technicians and contractors can't see estimates, the backlog, FCI or costs.

See your buildings in BuildingHelm.

We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.

Already a customer? Create your account.

A basement mechanical room: a row of grey boilers on the left, an expansion tank and an electrical panel at the back, and blue circulation pumps on the right.