Facility condition index and capital planning
Turn equipment age, condition and cost into the numbers a capital request needs: a deferred maintenance backlog, the Facility Condition Index for every building and a replacement plan for anywhere from 5 to 100 years ahead.

Sample data. Northfield University is a fictional university.
The problem
Capital requests that arrive without evidence
Capital money is competitive. A request for a boiler or a roof lands in front of finance, an owner or a board, and the first questions are always the same: how bad is it, how big is the whole backlog, and what's coming next year. Without records, the answer is a walk-through, a consultant or a spreadsheet put together the week before the meeting.
The surprises are the expensive part. A chiller fails and its replacement wasn't in anyone's plan, because nobody had the install date, the useful life and a cost estimate in the same place.
The Facility Condition Index, or FCI, gives the conversation a common measure. The convention comes from APPA, and it works for any building with a replacement value: FCI equals deferred maintenance cost divided by current replacement value. Under 0.05 is rated Good, 0.05 to 0.10 is Fair, and over 0.10 is Poor. For example, a building worth $10 million with $400,000 of deferred maintenance has an FCI of 0.04, which is Good.
How BuildingHelm handles it
From daily records to a capital plan you can defend
The equipment records your crew keeps every day feed the plan. BuildingHelm adds the cost side: replacement estimates, quotes, a backlog and building replacement values.

A backlog of deferred maintenance
On the Backlog tab, list unfunded work by building, with an optional equipment or room, description, estimated cost, priority (Life Safety, Code Compliance, Mission Critical or Deferrable), year identified and status (Open, Funded or Completed).
Suggestions from your records
Equipment past its useful life, or rated condition 1 or 2, is suggested for the backlog. Accept items one at a time or in bulk, or add them from a work order or punch item.
FCI by building and site
On the FCI tab, FCI counts open and funded items, and completed items drop out. Buildings without a replacement value are listed and left out of the site figure. Daily snapshots show the trend over time.
Replacement values you control
Enter each building's current replacement value, or let the app estimate it from square footage and building type. Estimated values are always labelled as estimated.
AI replacement estimates, clearly labelled
From any equipment page, get a budget-level estimate with low, likely and high totals, line items for equipment, labor, removal, materials, permits, design and contingency, its assumptions and a confidence level, adjusted for your location. Each is marked as an AI estimate with its date and is kept, never overwritten.
Contractor quotes take priority
Enter an actual quote next to the estimate. When a quote exists, it replaces the AI estimate in the capital plan and the backlog.
Capital plan by year
The Plan tab shows equipment by estimated replacement year, which is the install date plus the expected useful life, together with backlog items in their planned year, totalled by year, building and priority, from 5 up to 100 years ahead.
Export for the meeting
Export the capital plan and FCI report to PDF or Excel for budget meetings and board presentations.
How it works
From setup to a working routine
Step 1: Enter replacement values
Add a current replacement value to each building, or accept an estimate from square footage and building type and refine it later.
Step 2: Record age, life and condition
Each piece of equipment carries an install date, expected useful life and a condition rating from 1 to 5. Importing a building's documents fills in install dates where the closeout binders have them.
Step 3: Estimate or quote replacement costs
Get an AI estimate for budgeting, and add contractor quotes as you collect them.
Step 4: Build the backlog
Review the suggestions, add items from work orders and punch lists, and set a priority and planned year.
Step 5: Read the FCI and the plan
See each building rated Good, Fair or Poor, then the year-by-year plan, and export it.
Condition data gets better as preventive maintenance and punch list records feed the backlog. Book a demo to see an FCI report with sample data.

Illustrative photo.
Who uses it
Built for the crew, and the people they report to
The facilities team
Directors and facilities managers keep values up to date, review suggestions, get estimates and own the backlog and plan.
Technicians
Technicians don't see costs. Their condition ratings, work orders and punch items give managers the facts that feed the backlog.
Contractors
Contractors see none of this. Your team enters their quotes, and estimates, the backlog and FCI are never visible to vendors.
Finance and leadership
Finance, owners and boards use the read-only Viewer role to read the capital plan and FCI, and take the PDF or Excel exports into budget meetings.
FAQ
Frequently asked questions
What is the Facility Condition Index?
What counts as a good FCI?
How accurate are the AI estimates?
Does this replace a facility condition assessment?
Do we need a replacement value for every building?
Who can see costs and estimates?
Keep reading
Related pages
- Preventive maintenanceRecurring schedules, reminders and a clear list of what's overdue.Read more
- Compliance and inspectionsCode-required inspections, results and certificates in one report, ready for an audit.Read more
- Punch listsPhoto capture on a phone, assignment, approval, and PDF or Excel export.Read more
- K-12 school districtsFire, playground and boiler inspections, a small crew across many schools, and reports for the board.Read more
See your buildings in BuildingHelm.
We'll show you a site set up from sample building documents, walk through the day-to-day work, and talk about what setting up yours would take.
Already a customer? Create your account.