Getting started

Import a building's documents

Upload a building's drawings and manuals, and the AI proposes floor plans, rooms, equipment and tasks for you to check first.

Who it's for
Owner AdminsFacilities Managers
Where
On a computer1:23 video

Steps

  1. Step 1: On Buildings, select Import, then AI document import.

  2. Step 2: Choose the building, or New building.

  3. Step 3: Answer a few questions about the files.

  4. Step 4: Say how your room numbers differ.

  5. Step 5: Add your files and start the import.

  6. Step 6: Check each floor's plan.

  7. Step 7: Review the rooms.

  8. Step 8: Review equipment, maintenance tasks and documents.

  9. Step 9: Select Finish review.

    Screenshot: Select Finish review.

Transcript

Show the transcript

Have drawings, maintenance manuals or equipment lists for a building? Select Import on the Buildings page and choose AI document import, or select Import documents on the building's Drawings and Documents tab. Documents are imported into one building at a time.

From the Buildings page, choose which building the files belong to. If the building isn't in Building Helm yet, choose New building, add its name and address, and the import opens next.

Tell us which floors the building has, the date of the drawing set, and which set matches the building today. Add whether you have a door or room schedule, and anything that has changed since the drawings.

If you call room 101 something different from the drawings, say so here. The AI uses it to match rooms, and anything that doesn't match is flagged for you.

Add up to 20 files, up to 1,000 pages in all: drawings, O and M manuals, equipment lists, warranties. The AI reads them in the background, so you can leave the page and come back.

Under Floors and plans, the cleaned floor plan sits beside the architect's sheet. Choose Use cleaned, Use architect's sheet, or Skip. A floor that already has a plan stays as it is unless you tick Replace it.

New rooms are ticked for you to add. Where a room doesn't match the door or room schedule, choose which one is right.

Equipment, Maintenance tasks and Documents come next. Accept what's right, edit what's close, and skip what you can't confirm.

Nothing is added until you finish the review, and anything you skipped is left out. Then open Drawings and Documents to see the plans and the drawing sets you kept.